Spot Road Filtration System Well #23, Gladstone Land Corporation
One of many Filtration Systems Quality Ag installed from the concrete pad up at the 6,000 acre+ Spot road Alfalfa Farm in Arizona that pumps 3200 GPM.
Aliso Canyon Dehy 3, sempra energy
Quality Ag regularly completes slope stabilization projects.
Pacific Coast Pipeline Superfund Site (Chevron), Recon
Quality Ag provided dust control and clean up at the Fillmore Works Superfund site in Fillmore, CA. Safety was of the utmost importance while on site, from proper PPE to following strict protocol at all times.
Aliso canyon pole butt project, sempra energy
One of the many power poles we weed abate and then cover with slurry.
taylor lease, Crimson midstream, LLC
Quality Ag provided weed abatement services in high risk areas. Being aware is a major priority for our line of work.
lake piru debris removal, united water conservation district
Quality Ag hauling off debris from Lake Piru that accumulated after the storms.
Aliso Canyon edc project, sempra energy
Quality Ag installing Geoweb to assist in slope stabilization and weed maintenance.
harvest limoneira, coburn equipment rentals
Quality Ag provided water truck services for a housing development comprised of hundreds of houses.
Aliso Canyon Dehy 3, sempra energy
Gabion retaining wall constructed by Quality Ag to manage erosion, prevent runoff, and stabilize the soil.
Goleta N. perimeter project, sempra energy
Quality Ag offers tree trimming and on-site chipping. With all the necessary equipment in house, we are able to complete the entire project with ease.
creekbed cleanup, piru, ca
Quality Ag performed maintenance, clearing debris and excess material in a local creek, regaining access for property owners that couldn’t reach their land or water sources. This emergency service was provided after a heavy rain winter.
